Meeks Bay Ave. Lakefront - Meeks Bay, CA

Meeks Bay Ave. Lakefront
Meeks Bay, CA
Status: Sold

First day of raising

From floor to roof in 14 days

Precision Cuts

Corbels

Lakeside elevation

Beauty of authentic timber frame

Structural, exposed, finish timbers

Big boulders, pines, and timbers

Joinery

Placing rafter

Old and new, timber and steel

Front bent is assembled

Crane flies front bent

Front bent is placed

Meeks Bay

Teamwork

Top floor

Roof lines

Peak

New, custom, Timber Frame home merging old world craftsmanship with new world technologies.

A computerized multi-directional saw pre-cuts all of the timbers before they are shipped to the site. Upon arrival, the timbers are assembled using traditional, mortise and tenon joinery, and peg and dowel construction.

This method of construction has saved considerable time and labor expense. 2 week duration to build from the 1st floor to through the framed roof.

Additionally, ICF (Insulated Concrete Forms) and SIP (Structural Insulated Panel) systems were employed on this project.